    FUZZY OPTIMAL MODEL FOR RESOURCE-CONSTRAINED CONSTRUCTION SCHEDULING

  • Author/Authors

    Leu، Sou-Sen نويسنده , , Chen، An-Ting نويسنده , , Yang، Chung-Huei نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    -206
  • From page
    207
  • To page
    0
  • Abstract
    Activity duration is uncertain due to the variation in the outside environment, such as weather, site congestion, productivity level, etc. Furthermore, resources for construction activities are limited in the real construction world so that scheduling must include resource allocation. A new optimal resource-constrained construction scheduling model is proposed in this paper, in which the effects of both uncertain activity duration and resource constraints are taken into account. Fuzzy set theory is used to model the uncertainties of activity duration. A genetic algorithm-based searching technique is adopted to search for the fuzzy optimal project duration under resource constraints. The model can effectively provide the optimal fuzzy profiles of project duration and resource amounts under the constraint of limited resources.
  • Keywords
    Nomex , Surface displacement analysis , GFRP , High-order sandwich beam theory , Sandwich beams , Indentation , Localised effects
  • Journal title
    COMPUTING IN CIVIL ENGINEERING
  • Serial Year
    1999
  • Journal title
    COMPUTING IN CIVIL ENGINEERING
  • Record number

    5915