• Title of article

    Heuristics for production scheduling problem with machining and assembly operations

  • Author/Authors

    Bhongade، A S نويسنده , , Khodke، P.M. نويسنده ,

  • Issue Information
    دوفصلنامه با شماره پیاپی 8 سال 2012
  • Pages
    14
  • From page
    185
  • To page
    198
  • Abstract
    This work deals with production scheduling problem in an assembly flow shop, having parts machining followed by their subsequent assembly operations. Limited heuristics available on the problem, are based on unrealistic assumption that every part is processed on all machines. In this paper, two heuristics NEH_BB and Disjunctive are proposed to solve assembly flow shop scheduling problem where every part may not be processed on each machine. Exhaustive computational experiments are conducted with 60 trials each. The methods are found to be applicable to large size problems. The objective functions used for comparison are makespan and computational time. Disjunctive method takes very less computational time as compared to NEH_BB and hence claimed to be the better among available approaches for finding solution in assembly flow shop problems.
  • Journal title
    International Journal of Industrial Engineering Computations
  • Serial Year
    2012
  • Journal title
    International Journal of Industrial Engineering Computations
  • Record number

    655838