Title of article :
A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling
Author/Authors :
Naderi-Beni، Mahdi نويسنده , , Tavakkoli-Moghaddam، Reza نويسنده , , Naderi، Bahman نويسنده , , Ghobadian، Ehsan نويسنده , , Pourrousta، Alireza نويسنده ,
Issue Information :
دوفصلنامه با شماره پیاپی 10 سال 2012
Pages :
10
From page :
617
To page :
626
Abstract :
In this paper, we study no-wait flow shop problem where setup times depend on sequence of operations. The proposed problem considers sequence-independent removal times, release date with an additional assumption that there are some preliminary setup times. There are two objectives of weighted mean tardiness and makespan associated with the proposed model of this paper. We formulate the resulted problem as a mixed integer programming, where a two-phase fuzzy programming is implemented to solve the model. To examine the performance of the proposed model, we generate several sample data, randomly and compare the results with other methods. The preliminary results indicate that the proposed two-phase model of this paper performed relatively better than Zimmermanʹs single-phase fuzzy method.
Journal title :
International Journal of Industrial Engineering Computations
Serial Year :
2012
Journal title :
International Journal of Industrial Engineering Computations
Record number :
674382