Title of article :
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Author/Authors :
آريانژاد، ميربهادرقلي نويسنده Aryanejhad, M.B. , كريمي نسب، مهدي نويسنده Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran Karimi-Nasab, Mehdi , فاطمي قمي، سيد محمد تقي نويسنده Department of Indusrial Engineering, Amirkabir University of Technology, Tehran, Iran Fatemi Ghomi, Seyed Mohammad Taghi
Issue Information :
فصلنامه با شماره پیاپی 4 سال 2009
Pages :
11
From page :
1
To page :
11
Abstract :
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly.
Journal title :
Journal of Optimization in Industrial Engineering
Serial Year :
2009
Journal title :
Journal of Optimization in Industrial Engineering
Record number :
680638
Link To Document :
بازگشت