Title of article
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Author/Authors
آريانژاد، ميربهادرقلي نويسنده Aryanejhad, M.B. , كريمي نسب، مهدي نويسنده Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran Karimi-Nasab, Mehdi , فاطمي قمي، سيد محمد تقي نويسنده Department of Indusrial Engineering, Amirkabir University of Technology, Tehran, Iran Fatemi Ghomi, Seyed Mohammad Taghi
Issue Information
فصلنامه با شماره پیاپی 4 سال 2009
Pages
11
From page
1
To page
11
Abstract
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly.
Journal title
Journal of Optimization in Industrial Engineering
Serial Year
2009
Journal title
Journal of Optimization in Industrial Engineering
Record number
680638
Link To Document