• Title of article

    Single machine scheduling with fuzzy preemption penalties

  • Author/Authors

    Heydari، Mehdi نويسنده , , Mohammadi، Emran نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    8
  • From page
    122
  • To page
    129
  • Abstract
    In preemptive scheduling problems, processing of a job can be temporarily interrupted, and resumed at a later time. Conventionally, in the literature on preemptive scheduling, preempted jobs can simply be resumed from the point at which preemption occurred or restart from the beginning. However, this situation may not always be true in practice. It is likely that, in some cases, an imprecise or fuzzy part of jobs processing must be repeated, i.e., a fuzzy time penalty must be incurred. In this paper, we consider the single-machine scheduling problem of minimizing the total flow time subject to job release dates and fuzzy preemption penalties. We present a heuristic algorithm and validate it using some numerical examples.
  • Journal title
    The Journal of Mathematics and Computer Science(JMCS)
  • Serial Year
    2011
  • Journal title
    The Journal of Mathematics and Computer Science(JMCS)
  • Record number

    681129