Title of article :
Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time
Author/Authors :
Gupta، D نويسنده Prof. & Head. Department of Mathematics , , Sharma، S نويسنده Assistant Prof., Department of Mathematics , , Bala، S نويسنده Research Scholar, Department of Mathematics ,
Issue Information :
فصلنامه با شماره پیاپی 6 سال 2012
Abstract :
One of the earliest results in flow shop scheduling theory is an algorithm given by
Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time
whenever the processing times of jobs are random. The present paper is an attempt to develop a
heuristic algorithm for two stages specially structured flow shop scheduling in which the processing
times of the jobs are not completely random, but bear a well defined relationship to one another to
minimize the utilization time of machines and hence their rental cost under a specified rental policy.
Further the processing times and independent set up times, each are associated with probabilities. A
computer programme followed by a numerical illustration is given to validate the proposed algorithm.