Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time
Author/Authors :
Gupta، D نويسنده Prof. & Head. Department of Mathematics , , Sharma، S نويسنده Assistant Prof., Department of Mathematics , , Bala، S نويسنده Research Scholar, Department of Mathematics ,
Issue Information :
فصلنامه با شماره پیاپی 6 سال 2012
Pages :
13
From page :
31
To page :
43
Abstract :
One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs are not completely random, but bear a well defined relationship to one another to minimize the utilization time of machines and hence their rental cost under a specified rental policy. Further the processing times and independent set up times, each are associated with probabilities. A computer programme followed by a numerical illustration is given to validate the proposed algorithm.
Journal title :
International Journal of Applied Operational Research
Serial Year :
2012
Journal title :
International Journal of Applied Operational Research
Record number :
688679
Link To Document :
بازگشت