Title of article :
National evaluation of the US Department of Housing and Urban Development Lead-Based Paint Hazard Control Grant Program: Study methods
Author/Authors :
Warren Galke، نويسنده , , Scott Clark، نويسنده , , Pat McLaine، نويسنده , , Robert Bornschein، نويسنده , , Jonathan Wilson، نويسنده , , Paul Succop، نويسنده , , Sandy Roda، نويسنده , , Jill Breysse، نويسنده , , David Jacobs، نويسنده , , Joann Grote، نويسنده , , William Menrath، نويسنده , , Sherry Dixon، نويسنده , , Mei Chen، نويسنده , , Ralph Buncher، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2005
Pages :
14
From page :
315
To page :
328
Abstract :
The US Department of Housing and Urban Development (HUD) undertook an evaluation of its Lead Hazard Control Grant Program between 1994 and 1999. The Evaluation is the largest study ever done on the effectiveness of lead hazard controls implemented in residential dwellings. The Evaluation had several major objectives: determining the effectiveness of various lead hazard controls in reducing residential dust lead levels and childrenʹs blood lead levels, establishing the costs of doing lead hazard control work and factors that influence those costs, determining the rate of clearance testing failures and their causes, and identifying possible negative effects of lead hazard control work on childrenʹs blood lead levels. This paper reports the overall research design and data collection methods of the Evaluation. The large number of dwelling units enrolled in the Evaluation was possible only by the innovative partnership among HUD, the Evaluators, and the grantees. HUD and the Evaluators relied on the grantees for essentially all of the data collection. The 14 participating HUD Lead Hazard Control Grantees were responsible for implementing the lead hazard control programs in their communities and collecting the study data. This paper describes the methods for recruiting and enrolling dwellings and families, collecting environmental and housing data, interviewing participating families, and collecting data on lead hazard control work performed and its costs. The paper also describes the basic quality control and quality assurance procedures used. The principal outcome measures were lead in dust collected using wipes from floors, window sills, and window troughs and lead in blood collected from children who were 6 years old or younger at enrollment. Data collection was conducted before intervention, immediately postintervention, and 6 and 12 months postintervention. For a subset of dwellings undergoing an extended follow-up data were also collected at 24 and 36 months postintervention. This paper provides the context for subsequent reports that will describe such findings as the influence of lead hazard control work on serial dust lead levels, the influence of lead hazard control work on serial blood lead levels in children, the nature and costs of the lead hazard control work done at the dwellings, and the experience of the grantees in meeting clearance testing requirements.
Keywords :
Lead hazard remediation , blood lead levels , Clearance testing , Lead hazard control costs , Dust lead levels
Journal title :
Environmental Research
Serial Year :
2005
Journal title :
Environmental Research
Record number :
728233
Link To Document :
بازگشت