Title of article
The eawag bio-p module for activated sludge model no. 3
Author/Authors
L. Rieger، نويسنده , , G. Koch، نويسنده , , M. Kühni، نويسنده , , W. Gujer، نويسنده , , H. Siegrist، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
17
From page
3887
To page
3903
Abstract
An additional module for the prediction of enhanced biological phosphorus removal is presented on the basis of a calibrated version of ASM3. The module uses modified processes from ASM2d but neglects the fermentation of readily degradable substrate. Biomass decay is modeled in the form of endogenous respiration as in ASM3. Moreover, an additional glycogen pool and biologically induced P-precipitation were not taken into account. The module was systematically calibrated with experimental data from various batch experiments, a full-scale WWTP and a pilot plant treating Swiss municipal waste water. A standard parameter set allowed all data to be simulated.
Keywords
Full-scale experiments , batchexperiments , nutrient removal , Activated Sludge Model No. 3 , ASM3 , enhanced biological phosphorus removal , EBPR , Bio-P
Journal title
Water Research
Serial Year
2001
Journal title
Water Research
Record number
768168
Link To Document