• Title of article

    Nitrogen removal from on-site treated anaerobic effluents using intermittently aerated moving bed biofilm reactors at low temperatures

  • Author/Authors

    Sari Luostarinen، نويسنده , , Sami Luste، نويسنده , , Lara Valent?n، نويسنده , , Jukka Rintala، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2006
  • Pages
    9
  • From page
    1607
  • To page
    1615
  • Abstract
    On-site post-treatment of anaerobically pre-treated dairy parlour wastewater (DPWWe; 10 °C) and mixture of kitchen waste and black water (BWKWe; 20 °C) was studied in moving bed biofilm reactors (MBBR). The focus was on removal of nitrogen and of residual chemical oxygen demand (COD). Moreover, the effect of intermittent aeration and continuous vs. sequencing batch operation was studied. All MBBRs removed 50–60% of nitrogen and 40–70% of total COD (CODt). Complete nitrification was achieved, but denitrification was restricted by lack of carbon. Nitrogen removal was achieved in a single reactor by applying intermittent aeration. Continuous and sequencing batch operation provided similar nitrogen and COD removal, wherefore simpler continuous feeding may be preferred for on-site applications. Combination of pre-treating upflow anaerobic sludge blanket (UASB) -septic tank and MBBR removed over 92% of CODt, 99% of biological oxygen demand (BOD7), and 65–70% of nitrogen.
  • Keywords
    Aerobic post-treatmentAnaerobic pre-treatmentDenitrificationIntermittent aerationLow temperatureMoving bed biofilm reactorNitrificationNitrogen removalOn-site
  • Journal title
    Water Research
  • Serial Year
    2006
  • Journal title
    Water Research
  • Record number

    772928