Title of article
Nitrogen removal from on-site treated anaerobic effluents using intermittently aerated moving bed biofilm reactors at low temperatures
Author/Authors
Sari Luostarinen، نويسنده , , Sami Luste، نويسنده , , Lara Valent?n، نويسنده , , Jukka Rintala، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2006
Pages
9
From page
1607
To page
1615
Abstract
On-site post-treatment of anaerobically pre-treated dairy parlour wastewater (DPWWe; 10 °C) and mixture of kitchen waste and black water (BWKWe; 20 °C) was studied in moving bed biofilm reactors (MBBR). The focus was on removal of nitrogen and of residual chemical oxygen demand (COD). Moreover, the effect of intermittent aeration and continuous vs. sequencing batch operation was studied. All MBBRs removed 50–60% of nitrogen and 40–70% of total COD (CODt). Complete nitrification was achieved, but denitrification was restricted by lack of carbon. Nitrogen removal was achieved in a single reactor by applying intermittent aeration. Continuous and sequencing batch operation provided similar nitrogen and COD removal, wherefore simpler continuous feeding may be preferred for on-site applications. Combination of pre-treating upflow anaerobic sludge blanket (UASB) -septic tank and MBBR removed over 92% of CODt, 99% of biological oxygen demand (BOD7), and 65–70% of nitrogen.
Keywords
Aerobic post-treatmentAnaerobic pre-treatmentDenitrificationIntermittent aerationLow temperatureMoving bed biofilm reactorNitrificationNitrogen removalOn-site
Journal title
Water Research
Serial Year
2006
Journal title
Water Research
Record number
772928
Link To Document