Title of article :
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
Author/Authors :
Erhan، Kutanoglu, نويسنده , , RICHARD، CASSADY نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2003
Abstract :
Proposes an integrated model that simultaneously determines production scheduling and preventive maintenance planning decisions so that the total weighted tardiness of jobs is maximized. Comparison of the integrated solution and its performance with the solutions obtained from solving the production scheduling and preventive maintenance planning problems; Issues related to solving larger problems and extension.
Keywords :
Canonical form and rising ridges , classification and confirmation , Analysis of fitting ridge models with linear and nonlinear regression , Use of the linear regression models , Method of ridge identification
Journal title :
IIE TRANSACTIONS
Journal title :
IIE TRANSACTIONS