• Title of article

    A study to measure the impact of implementation of 5-S on pipe and profile: A case study of a pipe and profile maker

  • Author/Authors

    Karkehabadi، Hamidreza نويسنده , , Danaei ، Abolfazl نويسنده , , Orouei ، Mehran نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی 18 سال 2013
  • Pages
    4
  • From page
    1739
  • To page
    1742
  • Abstract
    Productivity improvement plays essential role on cost reduction and production planning in many organizations. There are literally various methods for measuring productivity and improving systems’ capabilities such as total quality management, 5S, etc. In this paper, we perform an empirical investigation to find out whether implementing 5S could reduce interruptions in production systems in one of pipe and profile manufacturing units located in province of Semnan, Iran. The proposed study compares the mean and standard deviations of waste materials before and after the implementation of 5-S in three different lines and statistical tests indicate that 5-S have made the necessary change on production planning and it could reduce waste materials, significantly.
  • Journal title
    Management Science Letters
  • Serial Year
    2013
  • Journal title
    Management Science Letters
  • Record number

    796267