• Title of article

    Calculation of contingency in construction projects

  • Author/Authors

    Touran، A نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2003
  • Pages
    -134
  • From page
    135
  • To page
    0
  • Abstract
    This paper presents a probabilistic model that considers the random nature of change orders and their impact on the cost and schedule of a construction project. The model incorporates uncertainties in project cost and schedule and calculates the contingency based on the level of confidence specified by the owner. It assumes a Poisson arrival pattern for change orders in a construction project. The effect of schedule delays in further increasing the project cost is considered explicitly and the effect of correlation between change orders is discussed and analytically considered. The proposed model may be used for budgeting purposes at the early stages of project development. Typical applications of the proposed model in the context of construction industry are discussed. A numerical example is presented that demonstrates the use of the model in establishing a budget contingency. The results of the example are compared with actual data from previous construction projects.
  • Keywords
    marine turtle , nesting behavior , sea surface temperature , egg laying , Florida
  • Journal title
    IEEE Transactions on Engineering Management
  • Serial Year
    2003
  • Journal title
    IEEE Transactions on Engineering Management
  • Record number

    79980