Title of article :
A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times
Author/Authors :
Laguna، Manuel نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
-124
From page :
125
To page :
0
Abstract :
The consideration of sequence-dependent setup times is one of the most difficult aspects of production scheduling problems. This paper reports on the development of a heuristic procedure to address a realistic production and inventory control problem in the presence of sequence-dependent setup times. The problem considers known monthly demands, variable production rates, holding costs, minimum and maximum inventory levels per product, and regular and overtime capacity limits. The problem is formulated as a Mixed-Integer Program (MIP), where subtour elimination constraints are needed to enforce the generation of job sequences in each month. By relaxing the subtour elimination constraints, the MIP formulation can be used to find a lower bound on the optimal solution. CPLEX 3.0 is used to calculate lower bounds for relatively small instances of this production problem, which are then used to assess the merit of a proposed heuristic. The heuristic is based on a simple short-term memory tabu search method that coordinates linear programming and traveling salesperson solvers in the search for optimal or near-optimal production plans.
Keywords :
LIX 63 , Aliquat 336 , Extraction kinetics , PALLADIUM
Journal title :
IIE TRANSACTIONS
Serial Year :
1999
Journal title :
IIE TRANSACTIONS
Record number :
8004
Link To Document :
بازگشت