• Title of article

    Determining the periodicity and planned lead time in serial-production systems with dependent demand and uncertain lead time

  • Author/Authors

    Sadeghi ، Haibatolah نويسنده , , Makui، Ahmad نويسنده , , Heydari، Mehdi نويسنده ,

  • Issue Information
    فصلنامه با شماره پیاپی 2 سال 2013
  • Pages
    12
  • From page
    87
  • To page
    98
  • Abstract
    This paper considers a multi period serial production systems for one product and deals with the problem of planned lead-time calculation in a Material Requirement Planning (MRP) environment under probabilistic lead times. It is assumed that lead times for all stages have the same distribution with different parameters. A MRP approach with periodic order quantity (POQ) policy is used for the supply planning of components. The objective is to minimize the sum of fixed ordering, holding and backlogging costs. A mathematical model is suggested and then an optimal planning lead-time, ordering quantity and periodic time are determined.
  • Journal title
    Uncertain Supply Chain Management
  • Serial Year
    2013
  • Journal title
    Uncertain Supply Chain Management
  • Record number

    831858