Title of article :
An ABC analysis for power generation project
Author/Authors :
Hasani ، Batool نويسنده , , Vakilalroaia ، Younos نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی 19 سال 2013
Pages :
6
From page :
1943
To page :
1948
Abstract :
One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.
Journal title :
Management Science Letters
Serial Year :
2013
Journal title :
Management Science Letters
Record number :
841872
Link To Document :
بازگشت