• Title of article

    Bi-Objective MRCPCP problem with Bees Metaheuristic Algorithm

  • Author/Authors

    Sadeghi Hasnijeh، Amir Hossein نويسنده , , Alahyari، Ahmad نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی 0 سال 2013
  • Pages
    6
  • From page
    2165
  • To page
    2170
  • Abstract
    ABSTRACT: The resource-constrained project scheduling problem with multiple modes (MRCPSP) is an extension of the well-known single-mode RCPSP and involves the selection of a time/resource combination for each activity such that the total project makespan is minimized This research has made use of the Bees Algorithm to solve the reputed multi-mode resource constrained project scheduling problem (MRCPSP) that has two objective and called bi-objective and the result revealed that this population based algorithm performed good enough.
  • Journal title
    International Research Journal of Applied and Basic Sciences
  • Serial Year
    2013
  • Journal title
    International Research Journal of Applied and Basic Sciences
  • Record number

    876313