Title of article
Bi-Objective MRCPCP problem with Bees Metaheuristic Algorithm
Author/Authors
Sadeghi Hasnijeh، Amir Hossein نويسنده , , Alahyari، Ahmad نويسنده ,
Issue Information
ماهنامه با شماره پیاپی 0 سال 2013
Pages
6
From page
2165
To page
2170
Abstract
ABSTRACT: The resource-constrained project scheduling problem with multiple modes (MRCPSP) is an extension of the well-known single-mode RCPSP and involves the selection of a time/resource combination for each activity such that the total project makespan is minimized This research has made use of the Bees Algorithm to solve the reputed multi-mode resource constrained project scheduling problem (MRCPSP) that has two objective and called bi-objective and the result revealed that this population based algorithm performed good enough.
Journal title
International Research Journal of Applied and Basic Sciences
Serial Year
2013
Journal title
International Research Journal of Applied and Basic Sciences
Record number
876313
Link To Document