Title of article :
Real-time risk assessment of operational events Original Research Article
Author/Authors :
L.J. Perryman، نويسنده , , N.A.S. Foster، نويسنده , , D.R. Nicholls، نويسنده , , J.F. Grobbelaar، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1996
Pages :
9
From page :
203
To page :
211
Abstract :
Probabilistic risk assessment (PRA) has always been fundamental to the licensing process of Koeberg nuclear power station. Furthermore, over the past 8 years PRA has assisted in many areas of operation. One of these areas is the real-time assessment of abnormal operating events. Over the years, considerable experience has been gained in using PRA to improve plant safety and performance. This paper presents some of the insights obtained in using PRA in such a dynamic role and demonstrates that, by developing and using the plant-specific ‘living’ PRA, considerable safety and financial gains can be obtained. These insights specifically concern the prerequisites before optimal use of a plant-specific ‘living’ PRA can be made. Finally, examples are presented of occurrences when PRA was used to improve plant safety and performance. These examples serve to demonstrate the advantages that can be obtained if sufficient resources are placed at the disposal of the PRA team.
Journal title :
Nuclear Engineering and Design Eslah
Serial Year :
1996
Journal title :
Nuclear Engineering and Design Eslah
Record number :
887982
Link To Document :
بازگشت