Title of article :
Assessment of integrity of components in piping of 500 MWe PHWR: using R-6 method Original Research Article
Author/Authors :
Rohit Rastogi، نويسنده , , Vivek Bhasin، نويسنده , , K.K Vaze، نويسنده , , H.S. Kushwaha، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2002
Abstract :
The primary heat transport system of 500 MWe Indian PHWR comprises of straight pipes, elbows and headers. A study was conducted to qualify piping system for leak before break. R-6 method was used to assess integrity of system for leakage size crack (LSC), the margins on crack initiation load and unstable crack growth loads. Option 2 (material specific failure assessment diagram), Category 3 (ductile tearing) analysis was used for straight pipes, elbows and header. In order to enhance the confidence in the analytical results, detailed sensitivity analysis was also performed. For sensitivity analysis, variation in material properties, LSC was considered. The effect of variation in temperature on material properties was also considered. Tensile and fracture properties used for base and weld material data were generated from pipe material obtained from 220 MWe Nuclear Power Plant, under construction.
Journal title :
Nuclear Engineering and Design Eslah
Journal title :
Nuclear Engineering and Design Eslah