Title of article :
Optimum RCS depressurization strategy for effective severe accident management of station black out accident Original Research Article
Author/Authors :
Changwook Huh، نويسنده , , Namduk Suh، نويسنده , , Goon Cherl Park، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
9
From page :
2521
To page :
2529
Abstract :
Plant specific severe accident management guidelines (SAMG) for operating plants are developed and implemented in Korea as was required by government policy on severe accident. Korea Institute of Nuclear Safety (KINS) has recently reviewed feasibility of the developed SAMG for Ulchin unit 1 plant. Among the strategies referred in SAMG, we have intensively analyzed the reactor coolant system (RCS) depressurization strategy during station black out (SBO) accident scenario, which has a high probability of occurrence according to Ulchin unit 1 Probabilistic Safety Analysis (PSA). In depressurization strategy of the current SAMG, operators need to depressurize rapidly RCS pressure below 2.75 MPa using pressurizer (PZR) pilot operated safety relief valves (POSRVs) for high pressure accident like SBO. The rapid depressurization is effective in allowing the water of safety injection tank (SIT) to be injected into the core, but an excessive discharge of the SIT water is not desirable for an economical use of SIT inventory. Lack of SIT water accelerates the core damage in case the failed electric power do not recover in due to time. The SIT inventory economy means here that we should not waste the water inventory of SIT and use it in the most efficient way to cool the core. In case we do not use it in an economical way, the SIT might be depleted too rapidly, thus leaving an insufficient reservoir for post-depressurization cooling. The quantification of this SIT inventory economy for plant specific situation is of interest to develop an optimum depressurization strategy. In this study we have analyzed an effectiveness of current depressurization strategy for SBO accident with the severe accident analysis code MELCOR 1.8.5 which has been used for regulatory purpose in KINS. The entry time of severe accident management, a grace time gained by the current strategy, and the economy of the discharge mass flow rate for Ulchin plant were evaluated. Moreover, through a simple energy balance equation we could find an optimum strategy for RCS depressurization. The proposed strategy is based on finding an optimum discharge rate for an efficient use of the SIT inventory and it allows us to handle an SBO accident with higher confidence. The proposed strategy is yet a theoretical one, but possibilities of how to incorporate this strategy into engineered safety features are also discussed.
Journal title :
Nuclear Engineering and Design Eslah
Serial Year :
2009
Journal title :
Nuclear Engineering and Design Eslah
Record number :
895462
Link To Document :
بازگشت