Ignalina NPP is the only nuclear power plant in Lithuania consisting of two units, commissioned in 1983 and 1987. Unit 1 of Ignalina NPP was shutdown for decommissioning at the end of 2004 and Unit 2 is to be operated until the end of 2009. Both units are equipped with channel-type graphite-moderated boiling water reactors RBMK-1500. According to the design, the spent fuel should be returned for reprocessing to Russia. However actually any fuel assembly has not been taken out from territory of the Ignalina NPP and all assemblies of spent fuel are stored in the spent fuel pools and dry on-site storage facility. Thus, the safety justification of facilities for intermediate spent fuel assemblies’ storage in Ignalina NPP is very important. This paper presents the results of loss of heat removal accidents (the most probable beyond design basis accident) in spent fuel pools of Ignalina NPP. The analysis was performed by employing best-estimate system thermal hydraulic code RELAP5 and codes for severe accidents ATHLET-CD and ASTEC. The best-estimate analysis, performed using RELAP5, allowed to investigate in the details the water evaporation, uncovering and fuel assemblies heat-up processes, when heat removal from the structures of buildings and pools are evaluated. The processes of spent fuel assemblies’ degradation due to loss of long-term heat removal were analyzed using ATHLET-CD and ASTEC codes. The results of calculations showed that the increase in water temperature in the pools from 50 °C up to 100 °C takes approximately 80–110 h, the evaporation of water volume down to uncovering of fuel assemblies takes approximately 220–260 additional hours. Later, after 200–300 h, the temperature of fuel claddings exceeds 800–1000 °C and the failures of fuel claddings occur due to cladding ballooning. The total amount of hydrogen generated up to time of complete water evaporation from spent fuel pools is about 7500–16,000 kg. These results of performed analysis were used for development of accident management guidelines for spent fuel pools of RBMK-1500.
Journal title :
Nuclear Engineering and Design Eslah
Journal title :
Nuclear Engineering and Design Eslah