Title of article
Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
Author/Authors
Xiaopan Zhang، نويسنده , , Xiaohui Yuan، نويسنده , , Yanbin Yuan، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2008
Pages
9
From page
151
To page
159
Abstract
The purpose of this paper is to deal with the optimal navigation co-scheduling (NCS) for the two dams of the Three Gorges Project in China, i.e., the Three Gorges Dam and the Gezhouba Dam. The co-scheduling includes the operational scheduling for all five locks of the two dams, and the dispatching scheduling to ships applying to pass the dams. Compared with the flexible manufacturing system (FMS), a mixed-integer nonlinear programming model is designed for the NCS, and an improved hybrid algorithm of simulated annealing and local search is addressed to obtain optimal scheduling. Experiments based on real historical execution data show that the approach is feasible.
Keywords
Local search , Simulated annealing , Mixed-integer nonlinear programming , Optimal navigation co-scheduling , Three gorges project
Journal title
Computers and Mathematics with Applications
Serial Year
2008
Journal title
Computers and Mathematics with Applications
Record number
920903
Link To Document