• Title of article

    Optimization and heuristic models to integrate project task and manpower scheduling

  • Author/Authors

    James Bailey، نويسنده , , Hesham Alfares، نويسنده , , Win Yuan Lin، نويسنده ,

  • Issue Information
    دوماهنامه با شماره پیاپی سال 1995
  • Pages
    4
  • From page
    473
  • To page
    476
  • Abstract
    The objective of project scheduling is to determine start dates and the labor resources assigned to each activity in order to complete a project on time. By moving start dates within available slack times and altering labor levels, the daily labor-demand profile can be changed. The objective of personnel scheduling is to determine how many of each feasible workday tour are required to satisfy a given labor-demand profile while minimizing the cost of labor plus overhead. Integrating these two problems permits the simultaneous determination of start dates, labor levels and tours for a minimum-cost and on-time schedule. In this paper, single and multiple resource optimization models and heuristic solution procedures to solve the integrated problem are presented. The heuristic procedure outperformed the non-integrated two-step scheduling procedure by reducing the cost of labor and overhead and performed nearly as well as the optimization procedure.
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1995
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924388