Title of article
Rapid prototyping work space optimization
Author/Authors
Adriano Nyaluke، نويسنده , , Bahaa Nasser، نويسنده , , Herman R. Leep، نويسنده , , Hamid R. Parsaei، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1996
Pages
4
From page
103
To page
106
Abstract
Rapid prototyping (RP) is becoming more affordable and the preferred method because the technology is shifting from making only prototypes to being used as a process for simultaneously producing multiple parts. The part placement in the RP systems is a time consuming and tedious task for the operators. This paper discusses component development in RP and part placement of models in the rapid prototyping machine work space to optimize utilization of RP systems. The algorithm proposed fills the work space with parts by partitioning the work volume into layers, and then filling these layers one after another.
Journal title
Computers & Industrial Engineering
Serial Year
1996
Journal title
Computers & Industrial Engineering
Record number
924508
Link To Document