Title of article :
A planning and scheduling system for manufacturing environment
Author/Authors :
M. G. Pereira، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 1996
Pages :
4
From page :
189
To page :
192
Abstract :
This article presents a resume of extensive research carried out in the area of construction of pre-molded parts. The problem was studied under several different aspects, such as construction, computation, planning, and good results were obtained. Construction with pre-molded elements means a promising future for Brazil. At present, little of this kind of construction has been done in the country, considering the total number of constructions. Nevertheless, it is a practical construction, used all over the world, and offers a number of advantages over conventional construction. In the social area it is quite important, for this kind of construction was utilized to reconstruct European cities after the wars of this century. At that time, great projects were carried out by architects of renown, such as Cropius and Le Corbusier, who left a mark in the history of civil construction.
Journal title :
Computers & Industrial Engineering
Serial Year :
1996
Journal title :
Computers & Industrial Engineering
Record number :
924529
Link To Document :
بازگشت