• Title of article

    Flow-time performance of modified scheduling heuristics in a dynamic rescheduling environment

  • Author/Authors

    Yi-Ching Eric Li، نويسنده , , Wade H. Shaw Jr.، نويسنده , , Louis A. Martin-Vega، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1996
  • Pages
    4
  • From page
    213
  • To page
    216
  • Abstract
    A generic, modular simulation model was constructed using the SLAM II discrete event modeling language to investigate the flowtime performance of a job shop. The findings of earlier research using conventional scheduling heuristics were confirmed and used to validate the design of revised AWINQ and MST heuristics. These heuristics were reformulated to take into account the state of the entire job shop at each rescheduling opportunity. Simulation results indicate that the revised heuristics perform better than the conventional SPT heuristic when job load is moderate. At high loads, the SPT rule was the preferred heuristic.
  • Keywords
    Jobshop , flowtime , Scheduling , simulation , dynamic scheduling , Heuristic
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1996
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924535