Title of article
DETERMINING THE OPTIMAL MOVE TIMES FOR A GIVEN CYCLIC SCHEDULE OF A MATERIAL HANDLING HOIST
Author/Authors
W.C. Ng and K.L. Mak، نويسنده , , J. LEUNG، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1997
Pages
12
From page
595
To page
606
Abstract
We consider the problem of determining the optimal integer start time and end time of each inter-tank move for a given cyclic schedule of a material handling hoist in a circuit board production line. This problem frequently arises in automated electroplating lines for manufacturing of printed circuit boards where each board must flow through a sequence of tanks and the processing time at each tank must fall inside a given time interval. The existing model for the problem assumes that the times required to perform inter-tank moves are given constants. However, as shown in a simple example, under this restrictive assumption a feasible cyclic schedule may be identified as infeasible. In this paper, the times for inter-tank moves are considered as decision variables of the problem. An algorithm is proposed to solve the problem optimally. A numerical example is used to illustrate the algorithm. The proposed model generalizes the existing model as the assumption of constant inter-tank move times is relaxed. © 1997 Elsevier Science Ltd
Journal title
Computers & Industrial Engineering
Serial Year
1997
Journal title
Computers & Industrial Engineering
Record number
924736