• Title of article

    DETERMINING THE OPTIMAL MOVE TIMES FOR A GIVEN CYCLIC SCHEDULE OF A MATERIAL HANDLING HOIST

  • Author/Authors

    W.C. Ng and K.L. Mak، نويسنده , , J. LEUNG، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    12
  • From page
    595
  • To page
    606
  • Abstract
    We consider the problem of determining the optimal integer start time and end time of each inter-tank move for a given cyclic schedule of a material handling hoist in a circuit board production line. This problem frequently arises in automated electroplating lines for manufacturing of printed circuit boards where each board must flow through a sequence of tanks and the processing time at each tank must fall inside a given time interval. The existing model for the problem assumes that the times required to perform inter-tank moves are given constants. However, as shown in a simple example, under this restrictive assumption a feasible cyclic schedule may be identified as infeasible. In this paper, the times for inter-tank moves are considered as decision variables of the problem. An algorithm is proposed to solve the problem optimally. A numerical example is used to illustrate the algorithm. The proposed model generalizes the existing model as the assumption of constant inter-tank move times is relaxed. © 1997 Elsevier Science Ltd
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1997
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924736