• Title of article

    A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs

  • Author/Authors

    C. Rajendran، نويسنده , , H. Ziegler ، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    4
  • From page
    281
  • To page
    284
  • Abstract
    The problem of scheduling in a static flowshop with sequence-dependent setup times of jobs (FSDS) is considered in this paper. A new heuristic to minimize the sum of weighted flowtime of jobs in a FSDS is proposed. An improvement scheme is supplemented to enhance the quality of the heuristic solution. An extensive computational performance analysis has shown that the proposed heuristic is computationally faster and more effective in yielding solutions of better quality than the existing heuristic. An interesting observation is that even though the proposed heuristic aims to minimize the sum of weighted flowtime of jobs (just like the existing heuristic), it fares much better than the existing heuristic in minimizing the maximum weighted flowtime of a job too.
  • Keywords
    Flowshop , sequence-dependent setup times , Scheduling , weighted flowtime , Heuristics
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1997
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924890