    Minimizing the number of tardy jobs in multi-period cell loading problems

  • Author/Authors

    Gursel A. Suer، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    4
  • From page
    721
  • To page
    724
  • Abstract
    Cellular Manufacturing is gaining more acceptance in the industry. The performance of a cellular manufacturing system can be further improved by addressing planning issues as well. The objective of this paper is to minimize the number of tardy jobs in a multi-period environment. Different approaches are discussed and mathematical formulations are presented along with the advantages and disadvantages of each approach. Later, the results of each approach are illustrated with a simple example problem. Finally, possible extensions to the models are discussed.Cellular Manufacturing is gaining more acceptance in the industry. The performance of a cellular manufacturing system can be further improved by addressing planning issues as well. The objective of this paper is to minimize the number of tardy jobs in a multi-period environment. Different approaches are discussed and mathematical formulations are presented along with the advantages and disadvantages of each approach. Later, the results of each approach are illustrated with a simple example problem. Finally, possible extensions to the models are discussed.
  • Keywords
    Cellular manufacturing , Tardy jobs , Multi-period
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1997
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924997