Title of article
Multi-objective scheduling with fuzzy due-date
Author/Authors
Tadahiko Murata، نويسنده , , Mitsuo Gen، نويسنده , , Hisao Ishibuchi، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1998
Pages
4
From page
439
To page
442
Abstract
In this paper, we examine the characteristic features of multi-objective scheduling problems formulated with the concept of fuzzy due-date. By computer simulations, we show that various scheduling criteria can be expressed by modifying the shape of membership functions of fuzzy due-dates. We also show the difficulty in handling the minimum satisfaction grade as a scheduling criterion. This difficulty is caused by the fact that the minimum satisfaction grade is zero for almost all schedules. This makes many search algorithms inefficient. We suggest an idea to cope with this difficulty.
Keywords
Fuzzy flowshop scheduling problem , fuzzy due-date , multi-objective scheduling problem
Journal title
Computers & Industrial Engineering
Serial Year
1998
Journal title
Computers & Industrial Engineering
Record number
925255
Link To Document