Title of article :
A heuristic for job shop scheduling to minimize total weighted tardiness
Author/Authors :
Makoto Asano، نويسنده , , Hiroshi Ohta، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2002
Pages :
11
From page :
137
To page :
147
Abstract :
This paper considers the job shop scheduling problem to minimize the total weighted tardiness with job-specific due dates and delay penalties, and a heuristic algorithm based on the tree search procedure is developed for solving the problem. A certain job shop scheduling to minimize the maximum tardiness subject to fixed sub-schedules is solved at each node of the search tree, and the successor nodes are generated, where the sub-schedules of the operations are fixed. Thus, a schedule is obtained at each node, and the sub-optimum solution is determined among the obtained schedules. Computational results on some 10 jobs and 10 machines problems and 15 jobs and 15 machines problems show that the proposed algorithm can find the sub-optimum solutions with a little computation time.
Keywords :
Job shop scheduling , Heuristic algorithm , Total weighted tardiness
Journal title :
Computers & Industrial Engineering
Serial Year :
2002
Journal title :
Computers & Industrial Engineering
Record number :
925313
Link To Document :
بازگشت