• Title of article

    Minimizing the number of tardy jobs under piecewise-linear deterioration q

  • Author/Authors

    Ghasem Moslehi ?، نويسنده , , Abbasali Jafari، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    12
  • From page
    573
  • To page
    584
  • Abstract
    In this paper, we consider a single machine scheduling problem with piecewise-linear deterioration where its objective is to minimize the number of tardy jobs, in which the processing time of each job depends on its starting time where all the jobs have a specific deterioration rate. The problem is known to be NP-hard; therefore a Branch and Bound algorithm and a heuristic algorithm with O(n2) are proposed. The proposed heuristic algorithm has been utilized for solving large scale problems and upper bound of the B&B algorithm. Computational experiments on 1840 problems demonstrate that the Branch and Bound procedure can solve problems with 28 jobs and 85.4% of all the sample problems optimally showing the high capability of the proposed procedure. Also it is shown that the average value of the ratio of optimal answer to the heuristic algorithm result with the objective Pð1 UiÞ is at last 1.08 which is more efficient in contrast to other proposed algorithms in related studies in the literature. According to high efficacy of the heuristic algorithm, large scale samples are also being solved and the results are presented. A specific form of this problem is also being considered and it is proven that the B&B procedure can handle problems with more jobs even up to 44 jobs.
  • Keywords
    Scheduling , Deteriorating jobs , Branch and Bound , Single machine
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2010
  • Journal title
    Computers & Industrial Engineering
  • Record number

    925969