Title of article :
A robust hierarchical production planning for a capacitated two-stage
production system
Author/Authors :
El-Houssaine Aghezzaf، نويسنده , , ?، نويسنده , , Carles Sitompul a، نويسنده , , ?، نويسنده , , Frank Van den Broecke b، نويسنده , , ?، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2011
Abstract :
In this paper, we propose a robust hierarchical production planning approach for a two-stage real world
capacitated production system operating in an uncertain environment. The first stage of the system produces
a set of semi-finished products having relatively stable annual demands, and the second finishing
stage produces finished products having highly variable weekly demands. The fixed production setup
costs incurred at the first stage are considerably high. Fixed production setup costs incurred at the second
stage are fairly small compared to those of the first stage. We propose an integrated hierarchical planning
model, where semi-finished products from the first stage (i.e. the aggregate level) are disaggregated into
finished products to be produced in the second stage (i.e. the operational level). As a result of the relatively
stable demands and the high setup costs experienced at the first stage, a cyclical aggregate planning
model is proposed for production planning at the upper level of the hierarchical plan. Based on
this aggregate plan, a modified periodic review policy is then proposed for production planning at the
lower level. Finally, a coupling plan, linking the two planning levels, is proposed to ensure the feasibility
of the disaggregation process at every period.
Keywords :
Robust planning , Hierarchical production , Periodic review , Cyclical planning
Journal title :
Computers & Industrial Engineering
Journal title :
Computers & Industrial Engineering