Title of article
An assembly scheduler for TFT LCD manufacturing
Author/Authors
Bongju Jeong، نويسنده , , Si-Won Kim، نويسنده , , Yun-Jun Lee، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2001
Pages
22
From page
37
To page
58
Abstract
This paper presents development of a scheduling system for Thin Film Transistor Liquid Crystal Display (TFT LCD) assembly process. With given daily production plan that is rough-cut capacitated, the scheduler generates shift-based capacity feasible schedules at each assembly step. The scheduling problem is a parallel-machine scheduling problem with sequence dependent setups and some manufacturing environments, which make the problem considerably difficult. The scheduling objective is to minimize the mean flow time and maximize the production progressiveness. Two scheduling heuristics are proposed for each production step of assembly process. The first scheduling heuristic is applicable for the first three steps of assembly process, i.e. coating, rubbing, and attaching step, and for the later steps another similar heuristic is employed. We also propose a simple method for computing production requirements for each step where daily production demand is unknown. The proposed scheduling procedures are implemented in a real TFT LCD manufacturing line and their performances are investigated. The experimental results show that the proposed scheduler provides quite better schedules than the current practice employed in the line in terms of both mean flow time and fulfillment of production demands.
Keywords
TFT LCD manufacturing , Scheduling , Sequence-dependent setup
Journal title
Computers & Industrial Engineering
Serial Year
2001
Journal title
Computers & Industrial Engineering
Record number
926224
Link To Document