• Title of article

    On the workload and ‘phaseload’ allocation problems of short reliable production lines with finite buffers

  • Author/Authors

    M.I. Vidalis، نويسنده , , C.T. Papadopoulos، نويسنده , , C. Heavey، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2005
  • Pages
    13
  • From page
    825
  • To page
    837
  • Abstract
    Serial flow or production lines are modeled as tandem queueing networks and formulated as continuous-time Markov chains to investigate how to maximize throughput or minimize the average work-in-process (WIP) when the total service time and the total number of service phases among the stations are fixed (these are the workload and ‘phaseload’ allocation problems, respectively). This paper examines both the effect of the kind of service time distribution on the optimal workload allocation in order to maximize throughput or minimize the average WIP of perfectly reliable production lines. The new approach of this work is the differentiation of the number of service phases of the service time distribution which is assumed to be of phase type at all stations of the flow line and the placement of storage space (buffers) between any two successive stations in order to examine the effect of these factors to the form of the optimal workload vector t and the optimal service phase vector ph
  • Keywords
    Reliable workstations , ‘Phase-load’ allocation problem , Flow/production lines , Workload allocation problem
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2005
  • Journal title
    Computers & Industrial Engineering
  • Record number

    926565