• Title of article

    Selecting jobs for a heavily loaded shop with lateness penalties

  • Author/Authors

    Susan A. Slotnick، نويسنده , , Thomas E. Morton، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1996
  • Pages
    10
  • From page
    131
  • To page
    140
  • Abstract
    One way of adjusting the workload in a manufacturing facility when available jobs exceed current capacity is to select a subset of jobs with the objective of maximizing total net profit for the firm, that is revenue contributed by jobs processed less a penalty for lateness. This motivates us to formulate the objective function in terms of revenues minus costs, in order to reflect the trade-offs faced by the firm itself, which views costs mainly in the context of the reduction of its profits. We present a model that uses weighted lateness as a criterion for time-related penalties. Taking advantage of two special characteristics of the problem, we develop an optimal algorithm and two heuristic procedures. Computational results show that the myopic heuristic demonstrates near-optimal performance in a fraction of the processing time of the optimal benchmark.
  • Journal title
    Computers and Operations Research
  • Serial Year
    1996
  • Journal title
    Computers and Operations Research
  • Record number

    926711