• Title of article

    Crew scheduling of light rail transit in Hong Kong: from modeling to implementation

  • Author/Authors

    Sydney C. K. Chu، نويسنده , , Edmond C. H. Chan، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1998
  • Pages
    8
  • From page
    887
  • To page
    894
  • Abstract
    This work concerns the problem of crew scheduling for the Hong Kong Light Rail Transit (LRT), which together with Heavy Rail Transit, makes up the two divisions of Kowloon–Canton Railway Corporation. As of early 1996, LRT operates eight routes, two train depots and 57 stations on its operational network. It is rapidly expanding on routes, capacities and territorial coverage, hence pressing needs for timely constructions of crew schedules whenever passenger demand variations necessitate modifications in train timetables, typically every 3–4 months. Computer-assisted manual solutions from old software can take up to 1 month of painstaking work. Our project aims at automating this complex schedule construction, adopting a novel optimization modeling approach amenable for decomposition into separate solution stages by network and heuristics algorithms. The entire crew schedule can be constructed iteratively in less than half an hour on a PC. The implementation runs as a decision support tool, with contributions of an overwhelming reduction in human effort in crew schedule construction and a feasible and better (higher productivity rate) schedule, with possible further manual improvements that can be made.
  • Keywords
    crew scheduling , optimization modeling , Heuristics
  • Journal title
    Computers and Operations Research
  • Serial Year
    1998
  • Journal title
    Computers and Operations Research
  • Record number

    926963