Title of article
Decomposition methods for large job shops
Author/Authors
Marcos Singer، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2001
Pages
15
From page
193
To page
207
Abstract
A rolling horizon heuristic is presented for large job shops, in which the total weighted tardiness must be minimized. The method divides a given instance into a number of subproblems, each having to correspond to a time window of the overall schedule, which are solved using a shifting bottleneck heuristic. A number of rules for defining each time window are derived. The method is tested by using instances up to 10 machines and 100 operations per machine, outperforming a shifting bottleneck heuristic that has been shown to generate close to optimal results.
Keywords
Job shop , Scheduling , Rolling horizon
Journal title
Computers and Operations Research
Serial Year
2001
Journal title
Computers and Operations Research
Record number
927132
Link To Document