• Title of article

    An approximation of the activity duration distribution in PERT

  • Author/Authors

    I. M. Premachandra، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2001
  • Pages
    10
  • From page
    443
  • To page
    452
  • Abstract
    PERT is widely used as a tool for managing large-scale projects. The traditional PERT approach uses the beta distribution as the distribution of activity duration and estimates the mean and the variance of activity duration based on the “pessimistic”, “optimistic” and “most likely” time estimates. Several authors have modified the original three point PERT estimators to improve the accuracy of the estimates. This article proposes new approximations for the mean and the variance of activity based on “pessimistic”, “optimistic” and “most likely” time estimates. By numerical comparison with actual values, the proposal is shown as more accurate than the original PERT estimates and its modifications. Another advantage of the proposed approximation is that it requires no assumptions about the parameters of the beta distribution as in the case of existing ones.
  • Keywords
    PERT , beta distribution , Project Management , Estimating the mean and the variance of activity times
  • Journal title
    Computers and Operations Research
  • Serial Year
    2001
  • Journal title
    Computers and Operations Research
  • Record number

    927146