Title of article
Single machine weighted earliness–tardiness penalty problem with a common due date
Author/Authors
Sakib A. Mondal، نويسنده , , Anup K. Sen، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2001
Pages
21
From page
649
To page
669
Abstract
In this paper, we have considered a class of single machine job scheduling problems where the objective is to minimize the weighted sum of earliness–tardiness penalties of jobs. The weights are job-independent but they depend on whether a job is early or tardy. The restricted version of the problem where the common due date is smaller than a critical value, is known to be NP-complete. While dynamic programming formulation runs out of memory for large problem instances, depth-first branch-and-bound formulation runs slow for large problems since it uses a tree search space. In this paper, we have suggested an algorithm to optimally solve large instances of the restricted version of the problem. The algorithm uses a graph search space. Unlike dynamic programming, the algorithm can output optimal solutions even when available memory is limited. It has been found to run faster than dynamic programming and depth-first branch-and-bound formulations and can solve much larger instances of the problem in reasonable time. New upper and lower bounds have been proposed and used. Experimental findings are given in detail.
Keywords
Single machine scheduling , Earliness–tardiness , Branch and Bound
Journal title
Computers and Operations Research
Serial Year
2001
Journal title
Computers and Operations Research
Record number
927159
Link To Document