Title of article
The three-stage assembly flowshop scheduling problem
Author/Authors
Christos Koulamas، نويسنده , , George J. Kyparisis، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2001
Pages
16
From page
689
To page
704
Abstract
We consider the three-stage assembly flowshop scheduling problem with the objective of minimizing the makespan. The three-stage assembly problem generalizes both the serial three machine flowshop problem and the two-stage assembly flowshop scheduling problem and is therefore strongly NP-hard. We analyze the worst-case ratio bound for several heuristics for this problem. We also analyze the worst-case absolute bound for a heuristic based on compact vector summation techniques and we point out that, for a large number of jobs, this heuristic becomes asymptotically optimal.
Keywords
Assembly problem , Approximation/heuristic , Worst-case analysis , Flowshop scheduling
Journal title
Computers and Operations Research
Serial Year
2001
Journal title
Computers and Operations Research
Record number
927161
Link To Document