Title of article :
Single hoist cyclic scheduling with multiple tanks: a material handling solution
Author/Authors :
Zhili Zhou، نويسنده , , Ling Li، نويسنده ,
Issue Information :
دوهفته نامه با شماره پیاپی سال 2003
Pages :
9
From page :
811
To page :
819
Abstract :
A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly affects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a specific material handling issue, in a manufacturing environment. The scope of the study is in the area of single hoist cyclic scheduling with multiple tanks. The purpose of the study is to develop a mixed integer linear programming model that can be used to schedule multiple tanks and improve throughput in a process industry. Specifically, a method has been proposed to estimate the processing time in a bottleneck stage with multiple tanks.
Keywords :
Bottleneck control , Industrial Engineering , Operations management , manufacturing processes , material handling , Mixed Integer Linear Programming , Hoist scheduling problem
Journal title :
Computers and Operations Research
Serial Year :
2003
Journal title :
Computers and Operations Research
Record number :
927382
Link To Document :
بازگشت