Parallel machine scheduling with earliness–tardiness penalties and additional resource constraints
Author/Authors
Jose A. Ventur، نويسنده , , Daecheol Kim، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2003
Pages
14
From page
1945
To page
1958
Abstract
This research considers the problem of scheduling jobs on parallel machines with noncommon due dates and additional resource constraints. The objective is to minimize the total absolute deviation of job completion times about the corresponding due dates. All job processing times are assumed to be the same. This problem is motivated by restrictions that occur in the handling and processing of jobs in certain phases of semiconductor manufacturing and other production systems. We examine two special cases. For the first of these, the number of additional resource types and the resource requirements per job are arbitrary. The problem is formulated as a zero–one integer linear program and the Lagrangian relaxation approach is used to obtain tight lower bounds. In the second case, there exist one single type of additional resource and the resource requirements per job are zero or one. This problem is shown to be equivalent to the asymmetric assignment problem.
Keywords
Lagrangian relaxation , Parallel machine scheduling , Earliness–tardiness penalties , Resource constraints
Journal title
Computers and Operations Research
Serial Year
2003
Journal title
Computers and Operations Research
Record number
927451
Link To Document