Title of article
An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops
Author/Authors
Ching-Fang Liaw، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2008
Pages
8
From page
3276
To page
3283
Abstract
This paper examines the problem of scheduling two-machine no-wait job shops to minimize makespan. The problem is known to be strongly NP-hard. A two-phase heuristic is developed to solve the problem. Phase 1 of the heuristic transforms the problem into a no-wait flow shop problem and solves it using the well known Gilmore and Gomory algorithm. Phase 2 of the heuristic improves the solution obtained in phase 1 using a simple tabu search algorithm. Computational results show that the proposed heuristic performs extremely well in terms of both solution quality and computation time. It finds an optimal solution to about 90% of the problem instances and the average deviation from the lower bond for the other problem instances is infinitesimal.
Keywords
No-wait , Tabu search , Job shop , Heuristic , Scheduling
Journal title
Computers and Operations Research
Serial Year
2008
Journal title
Computers and Operations Research
Record number
927550
Link To Document