• Title of article

    Analysis of heuristics for the UET two-machine flow shop problem with time delays

  • Author/Authors

    V.J. Rayward-Smith، نويسنده , , D. Rebaine، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2008
  • Pages
    13
  • From page
    3298
  • To page
    3310
  • Abstract
    The problem of minimising the overall completion time for the two-machine flow shop problem with unit execution time (UET) tasks and arbitrary time delays is known to be unary -hard. Two heuristic algorithms to solve this problem along with their worst-case analyses are presented. We also discuss computational experiments we conducted to study the average-case performance of these two heuristics using simulation and statistical sampling methods.
  • Keywords
    Time delays , Worst- and average-case analysis , Flow shop , Schedule length
  • Journal title
    Computers and Operations Research
  • Serial Year
    2008
  • Journal title
    Computers and Operations Research
  • Record number

    927552