• Title of article

    A solutionapproachtofindthecriticalpathinatime-constrained activity network

  • Author/Authors

    F. Guerriero ، نويسنده , , L.Talarico، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    13
  • From page
    1557
  • To page
    1569
  • Abstract
    Findingthelongestpathinanactivitynetwork,wheretimeconstraintsareattachedtoactivities,is generalizedfromthetraditionalcriticalpathproblem.Timeconstraintshaveattractedmuchresearch interest inrecentyears,becausetheycanbeusedtorepresentalargesetofrealsituations,arisingnot only inthefieldoftheprojectmanagement. In thispaper,weproposeageneralapproachforfindingthecriticalpathinadeterministicactivity- on-the-arcnetwork,consideringthreedifferenttypesoftimeconstraints.Thefirstoneisthe timewindow constraint,whichimposesthatanactivitycanstartonlyinapredefinedtimeinterval,whereas no constraintsareimposedontheactivitycompletiontime.Thesecondoneisthe time-schedule constraint,whichassumesthatanactivitycanstartitsexecutionatoneofthepre-specifiedinstantsof time. Thethirdoneisthe time-switch constraint,whichimposesaspecifiedstartingtimeontheproject activitiesandforcesthemtobeinactiveduringspecifiedtimeperiods. The algorithmintroducedinthispaperhasbeendevelopedbyredefiningandcombiningtogether two procedureswell-knowninthescientificliterature.Theformer,proposedbyChen,RinksandTangin 1997, canbeusedforfindingthecriticalpathinanactivitynetworkwheretime-scheduleandtime- windowconstraintsareconsidered.Thelatter,proposedbyYangandChenin2000,canbeappliedin activitynetworkswithonlytime-switchconstraints. The method,developedinthispaper,canbeusedtofindthecriticalpathinallthepractical situations,inwhichtheaforementionedtimeconstraintsaretakenintoaccountsimultaneously.The proposedapproachhasbeencodedinJavaandhasbeenvalidatedbyconsideringtwosetsofinstances: the formerhasbeentakenfromthepublicdomainprojectschedulingproblemlibrary, developedby Kolisch andSprecherin1997,whereasthelatterconsistsofrandomlygeneratedactivitynetworks. The computationalresultscollectedareverypromising,showingthatthesolutionprocessforthe consideredinstancesrequiredatmostfewseconds,usingacommercialPentiumclassPC.
  • Keywords
    Activity network , Critical path , Time-constrained network , Time-window constraint , Time-schedule constraint , Time-switch constraint
  • Journal title
    Computers and Operations Research
  • Serial Year
    2010
  • Journal title
    Computers and Operations Research
  • Record number

    927764