• Title of article

    Minimizing totalcompletiontimeonasinglemachinewithaflexible maintenanceactivity

  • Author/Authors

    Shan-Lin Yang b، نويسنده , , YingMa، نويسنده , , Dong-lingXu ، نويسنده , , Jian-boYang، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2011
  • Pages
    16
  • From page
    755
  • To page
    770
  • Abstract
    A problemofjointlyschedulingmultiplejobsandasinglemaintenanceactivityonasinglemachine with theobjectiveofminimizingtotalcompletiontimeisconsideredinthispaper.Itisassumedthat the machineshouldbestoppedformaintenancewhichtakesaconstantdurationwithinapredefined period.Theproblemisgeneralizedfromtheonewithafixedmaintenanceinthatitrelaxesthestarting time ofthemaintenancefromafixedtimepointtoapredefinedperiod.Bothresumableand nonresumablecasesarestudied.First,threepropertiesofanoptimalsolutiontoeachofthetwocases are identified.Thenitisshownthattheproposedshortestprocessingtime(SPT)algorithmisoptimal for theresumablecase.Asforthenonresumablecase,theconditionsunderwhichtheSPTalgorithmis optimalarealsospecified.Furthermore,itisshownthatrelaxingthestartingtimeofthemaintenance cannotimprovetherelativeerrorboundoftheSPTalgorithm.Thefocusofthepaperispresented afterwards,whichistodevelopadynamicprogrammingalgorithmandabranch-and-boundalgorithm to generateanoptimalsolutionforthiscase.Experimentalresultsshowthatthesealgorithmsare effectiveandcomplementaryindealingwithdifferentinstancesoftheproblem. Statementofscopeandpurpose: In themajorityofschedulingproblemswithpreventivemaintenance, maintenanceperiodsareassumedtobeconstant.However,inrealindustrysettings,suchperiodsmay be flexible.Therefore,itisnecessarytoconsiderschedulingproblemswithflexiblemaintenance.This paper focusesonasinglemachineprobleminwhichjobprocessingandmachinemaintenancehaveto be scheduledsimultaneously.Theobjectiveistominimizetotalcompletiontimeofjobsforboth resumableandnonresumablecases.Fortheresumablecase,aSPTalgorithmproposedinthispaperis showntobeoptimal.Ontheotherhand,forthenonresumablecase,therelativeworst-caseerrorbound of theSPTalgorithmisanalyzed,andfurther,adynamicprogrammingalgorithmandabranch-and- boundalgorithmareproposedtosolvethisproblemoptimally.Finally,experimentalresultsare providedtoshowtheeffectivenessandcomplementarityoftheabovealgorithms.
  • Keywords
    Single machine scheduling , Flexible maintenance , Dynamic programming , Shortest processing time , branch-and-bound
  • Journal title
    Computers and Operations Research
  • Serial Year
    2011
  • Journal title
    Computers and Operations Research
  • Record number

    927899