• Title of article

    Two-machineflowshopschedulingwithintermediatetransportationunder job physicalspaceconsideration

  • Author/Authors

    Hua Gong ، نويسنده , , LixinTang، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2011
  • Pages
    8
  • From page
    1267
  • To page
    1274
  • Abstract
    In thispaper,westudyacoordinatedproduction–transportationschedulingprobleminatwo-machine flowshopenvironmentwhereasingletransportermaycarryseveraljobssimultaneouslyasabatch betweenthemachines.Eachjobhasitsownphysical-spacerequirementwhilebeingloadedintothe transporter.Thegoalistominimizethemakespan.Forthejobswiththesamesizeofphysicalspaceduring transportation,wepresentaheuristicalgorithmwithanabsoluteworst-caseratioof2andapolynomial- time optimalalgorithmforaspecialcasewithgivenjobsequence.Forthejobshavingdifferentsizeof physicalstoragespace,aheuristicalgorithmisconstructedwithanabsoluteworst-caseratioof7/3and asymptoticworst-caseratioof20/9.Computationalexperimentsdemonstratethatthetwoheuristic algorithmsdevelopedarecapableofgeneratingnear-optimalsolutionsquickly.
  • Keywords
    Flowshop , Worst-case analysis , Coordinated scheduling , Logistics
  • Journal title
    Computers and Operations Research
  • Serial Year
    2011
  • Journal title
    Computers and Operations Research
  • Record number

    927944