Title of article
A note on minimizing maximum lateness in a two-machine no-wait flowshop
Author/Authors
Parthasarati Dileepan، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2004
Pages
5
From page
2111
To page
2115
Abstract
Job scheduling for a two-machine flowshop where wait time between the first and the second machine is not permitted is studied in this paper. Aldowaisan and Allahverdi (J. Oper. Res. Soc. 53(9) (2002) 1004) considered this problem with minimizing total flowtime as the scheduling criterion and presented some necessary conditions for optimality. In this note their results have been modified for the scheduling criterion of minimizing maximum lateness.
Keywords
Two-machine , No-wait , Lateness , Flowshop
Journal title
Computers and Operations Research
Serial Year
2004
Journal title
Computers and Operations Research
Record number
928129
Link To Document