Title of article
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
Author/Authors
Murali Sambasivan، نويسنده , , Salleh Yahya، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2005
Pages
19
From page
537
To page
555
Abstract
This paper addresses scheduling of lot sizes in a multi-plant, multi-item, multi-period, capacitated environment with inter-plant transfers. A real-world problem in a company manufacturing steel rolled products provided motivation to this research. A Lagrangean-based approach, embedded with a lot shifting–splitting–merging routine, has been used for solving the multi-plant, capacitated lot-sizing problem. A “good” solution procedure developed by Sambasivan (Ph.D. Dissertation, University of Alabama, Tuscaloosa, 1994) has been used for solving the relaxed problem. About 120 randomly generated instances of the problem have been solved and it has been found that Lagrangean-based approach works quite “efficiently” for this problem.
Keywords
Multi-plant production planning , Lagrangean-based heuristic , Capacitated lot sizing
Journal title
Computers and Operations Research
Serial Year
2005
Journal title
Computers and Operations Research
Record number
928182