• Title of article

    Flow-shop scheduling for three serial stations with the last two duplicate

  • Author/Authors

    Ahmet Bolat، نويسنده , , Ibrahim Al-Harkan، نويسنده , , Bandar Al-Harbi، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2005
  • Pages
    21
  • From page
    647
  • To page
    667
  • Abstract
    This paper addresses the problem of scheduling jobs for three serial stations with the last two duplicate, i.e., identical. The performance measure considered is the makespan, and a Branch and Bound and two heuristic procedures are proposed. Two dominance criteria are developed to produce the optimal schedule for the jobs sequenced so far. Extensive computational experiments reveal that the Genetic Algorithm can be used to obtain a group of effective solutions for any realistic size problem within small computation time.
  • Keywords
    Scheduling , Serial and duplicate stations , Branch and Bound , Genetic Algorithm
  • Journal title
    Computers and Operations Research
  • Serial Year
    2005
  • Journal title
    Computers and Operations Research
  • Record number

    928189