Title of article
Flow-shop scheduling for three serial stations with the last two duplicate
Author/Authors
Ahmet Bolat، نويسنده , , Ibrahim Al-Harkan، نويسنده , , Bandar Al-Harbi، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2005
Pages
21
From page
647
To page
667
Abstract
This paper addresses the problem of scheduling jobs for three serial stations with the last two duplicate, i.e., identical. The performance measure considered is the makespan, and a Branch and Bound and two heuristic procedures are proposed. Two dominance criteria are developed to produce the optimal schedule for the jobs sequenced so far. Extensive computational experiments reveal that the Genetic Algorithm can be used to obtain a group of effective solutions for any realistic size problem within small computation time.
Keywords
Scheduling , Serial and duplicate stations , Branch and Bound , Genetic Algorithm
Journal title
Computers and Operations Research
Serial Year
2005
Journal title
Computers and Operations Research
Record number
928189
Link To Document